Optimized 6-Day Roots Free Clone Guide
(Refined with Luxe Bayside SOP principles, plus practical insights from experience.)
This guide ensures high success rates, pathogen-free clones, and faster root development, integrating moisture control, nutrient balance, and stress management.
Environmental Parameters for Clones
- Temperature: 78-80°F
- Humidity: 85-95% (Days 1-5), gradually lowering to 70-80%
- VPD Targets:
- Early Stage: 0.4-0.7 kPa
- Mid Stage: 0.7-1.0 kPa
- Late Stage: 1.0-1.2 kPa
- Lighting: Clone LED Bars
- DLI (Daily Light Integral): 6-8 mol/day
- PPFD: 100-150 µmol/m²/s
- CO₂ Levels: 400-600 ppm (no additional supplementation required)
- Airflow: Indirect, gentle to prevent moisture stagnation
Day 0 – Preparation & Mother Stock Conditioning
Sanitation & Tool Prep
- Sanitize scissors with Virkon S (1 tablet per 500ml H₂O).
- Rotate at least 5 pairs between plants.
- Wear gloves & respirator when handling dry Virkon powder.
Mother Stock Health Prep
- Routine foliar feed 5-7 days before cloning:
- Per gallon of water:
- 8g Cal106, 8g Cal58, 1g PCal
- 3.5ml Kelp Extract
- TM-7 Trace Minerals, Microbes, 0.08g Potassium Sulfate
Day 1 – Cutting & Initial Soak
Prepping Cuttings
- Select vigorous, healthy top-growth cuttings.
- Soak Q Plugs in full-strength nutrient solution:
- 10ml A, 10ml B, 5ml CalMag, 10ml Cleanse per gallon.
- Sanitize cuttings in 1 oz Oxidate per gallon RO water for 30 sec – 2 min.
- Store cuttings in nutrient solution in solo cups until ready.
Planting Process
- Use FloraFlex trays (or other tight-sealing dome setups).
- Alternate hole positions when gridding Q Plugs.
- Dip cut ends in DIP N GROW for 10-30 sec.
- Plug clones and place under Clone LED bars.
- Crack vents slightly to allow minor airflow.
- Leave untouched for 3 days.
Day 3 – Vent Adjustment & Moisture Control
- Burp domes to release excess humidity.
- Wipe dome condensation with a microfiber towel.
- Open vents to 50%.
- Spray foliage with Zerotol 2.0 (15ml/gal).
NOTE: If clones show stress (drooping, excessive drying), dial vents back slightly and gradually work towards 50% over the next 24 hours. Sudden shifts in ambient air temperature are best done around rehydration periods to minimize stress.
Day 4-6 – Routine Burp, Wipe, Spray
- Continue daily burping of domes.
- Wipe excess moisture from domes each day.
- Spray foliage with Zerotol 2.0 (15ml/gal).
- Monitor early root development – visible callusing should appear.
Day 7 – Water & Ventilation Check
- Burp domes as usual.
- Spray stems with Zerotol 15ml/gal.
- Water trays with full-strength veg nutrients (same as Day 1 mix).
- Wipe excess dome moisture.
NOTE: If clones appear stressed after watering, dial back any dome or vent adjustments and slowly increase over the next 12-24 hours. Eliminate excess water in tray.
Day 8 – Dome Adjustment & Increased Venting
- Slide domes back slightly (or use thumbtacks for a controlled gap).
- Spray stems with Zerotol 15ml/gal.
- Wipe moisture buildup from domes.
NOTE: If clones show signs of wilting or stress, re-close domes partially and work towards full exposure gradually. Major ambient air temp adjustments should align with rehydration periods to allow clones to adapt.
Day 9 – Hardening Off Begins
- Leave domes as is (no further adjustment).
- Observe clones’ ability to retain moisture independently.
Day 10 – Final Burp & Moisture Check
- Burp domes as a final moisture test.
- Spray stems with Zerotol 15ml/gal.
- Return to shelf for further observation.
NOTE: If clones show signs of drying too quickly, reintroduce a minor dome crack and reduce venting slightly.
Day 11 – Passive Hardening (No Adjustments)
- Leave clones untouched unless noticeable drying occurs.
- Do not mist or water unless clones appear stressed.
Day 12 – Final Watering Before Transplant
- Remove domes entirely.
- Spray stems lightly with Zerotol solution.
- Top-water or flood trays as needed (pour off excess).
- Continue ventilation monitoring for stress response.
Day 13 – Quality Control
- Remove unrooted clones from trays.
- Monitor final root mass development.
Day 14 – Transplant Ready!
- Clones should have fully developed roots.
- Perform final hardening adjustments based on clone resilience.
- Transplant into final growing medium.
Key Notes (From Luxe Bayside)
Routine Moisture Checks: Aim for dry backs but not bone dry.
Root Zone Hydration: Maintain light moisture levels, avoid oversaturation.
Dome Vent Adjustments: Gradual increase to 100% open by Day 12.
Clone Resilience Test: Observe stem firmness – avoid limp/wilted cuttings.
Avoid Overwatering: Let clones push for roots, reducing pathogen pressure.
Gradual Humidity Drops: Prevent humidity shock by slowly lowering RH.
Large Environmental Adjustments: Best made around rehydration periods to allow clones to recover smoothly.
Use code ROOTS15 for 15% OFF Your First Order!
Act Fast Only 48 Hours Before Coupon Expires & Top Strains Are Selling Out!

